Request Consultation

Ride Refurbishment

We have extensive experience in the refurbishment of all types of rides from a simple repaint project through to “as new” renovation.

Canobie Lake Park
Brooke Farr
Director, Canobie Lake Park

"We were impressed at how quickly the new system was installed and it has effectively given us a new ride at a fraction of the cost."

Full in-house capabilities for ride refurbishment

All works are carried out at our purpose built facility in the North West of England.  Any type of ride can be delivered to us where all elements of the job are carried out in-house including painting; fabrication; GRP repairs; mechanics; electrics; pneumatics, hydraulics and control system design.

Read our case study on refurbishing the Big Sheep's Rampage rollercoaster which opened at the Devon theme park in 2016.

Let’s talk about your rides

Whether you want to commission a new ride, refurbish an existing one, buy a stock item
or simply source some spare parts then we can help.